4.6 Installation of Control Panel(Console,Box and Cabinet)
4.6.1 Quantity for acceptance inspection.
1 Control panel(console,box and cabinet)installed in rows shall be inspected 100%.
2 Control panel(console,box and cabinet)installed separately shall be inspected 30% randomly.
3 Other installation items shall be inspected 20% randomly.
4.6.2 Installation of control panel.
1 Manufacture and installation inspection and acceptance of control panel(console,box and cabinet)and equipment base are detailed in Table 4.6.2-1.
Table 4.6.2-1 Manufacture and installation of control panel(console,box and cabinet)and equipment base
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_180.jpg?sign=1738398289-6KEOMMeopw63FZE53LyNrhmlcwJbxWzQ-0-bf1b1f4d5ac49e26811c76b11958e390)
Table 4.6.2-1(Continued)
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_181.jpg?sign=1738398289-eXMcK943B8jw3oHxzo6jioUJTxOGhuT9-0-537e320c446d665e36f4cbc97efc7ba1)
2 Installation inspection and acceptance of control panel(console,box and cabinet)and in rows are detailed in Table 4.6.2-2.
Table 4.6.2-2 Installation of control panel(console,box and cabinet)in rows
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_182.jpg?sign=1738398289-wiBCavunNUf2OzBSRWaJOdHqZ9GWx4vK-0-734888c62b7097c68d502bdc0f53a5d2)
3 Installation inspection and acceptance of individual panel(console,box and cabinet)are detailed in Table 4.6.2-3.
Table 4.6.2-3 Installation of individual panel(console,box and cabinet)
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_183.jpg?sign=1738398289-RgwTkk4UlOE2M0NqnonsbQgtV3kIgl4t-0-6215d34d99567edbd607574fad970e19)
4 Installation inspection and acceptance of thermostat,protective box and connection box are detailed in Table 4.6.2-4.
Table 4.6.2-4 Installation of thermostat,protective box and connection box
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_184.jpg?sign=1738398289-aK3gFUGVlpkyhKvg3RxrRERvZeeZI9qk-0-be18d1137c5308c1793bf44fb05b3d42)
Table 4.6.2-4(Continued)
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_185.jpg?sign=1738398289-iQJ8mYleViC0ZDDbMkFIDk7d7yGMcIu0-0-9d17088798efc8e14f95bd016068afa6)
4.6.3 Installation of instruments on panel.
1 Installation inspection and acceptance of instrument on panel are detailed in Table 4.6.3-1.
Table 4.6.3-1 Installation of instruments on panel
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_186.jpg?sign=1738398289-9yMVruMQJ6Vvvyk90jK4CG1YGtQw1TT0-0-2b80bd60fb898924bf8d764ebf4c56d5)
2 Installation inspection and acceptance of distributed control system are detailed in Table 4.6.3-2.
Table 4.6.3-2 installation of distributed control system
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_187.jpg?sign=1738398289-oNLqJUtM91ad0mnbhOZdUSMOxKafshse-0-f9c8f5007e2d2c823b6486af4e49e379)
3 Installation inspection and acceptance of digital display instrument are detailed in Table 4.6.3-3.
Table 4.6.3-3 Installation of digital display instrument
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_188.jpg?sign=1738398289-M8rEmDZn1yn5aNtBIzp111wIrxurnE6h-0-02e1a2942a84f861d926530f4c2ee798)
4 Installation inspection and acceptance of recording instrument are detailed in Table 4.6.3-4.
Table 4.6.3-4 Installation of recording instrument
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_189.jpg?sign=1738398289-H7emqDeUv5BO6e3SOjaMe306RRxlPmn5-0-9e1af79b019ff0bafed0bcdaa365ee27)
5 Inspection and acceptance of survey instrument are detailed in Table 4.6.3-5.
Table 4.6.3-5 Survey instrument
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_190.jpg?sign=1738398289-kNM87lGCSKXVIxfflNR0XZji5dAnFBaC-0-909119ad266c73b54f45f9f17626ef15)
6 Installation inspection and acceptance of flashing-signal alarm devices and large screen display are detailed in Table 4.6.3-6.
Table 4.6.3-6 Installation of flashing-signal alarm devices and large screen display
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_191.jpg?sign=1738398289-FpunpVIMQIX5yDfTSx7hRjhpn3w21EuK-0-729a5925607faf0d50e2352eaf77298f)
7 Installation inspection and acceptance of the control system for PLC are detailed in Table 4.6.3-7.
Table 4.6.3-7 Installation of the control system for PLC
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_192.jpg?sign=1738398289-abYfPKU3RxiJae03aOQaNJMsA8FywjKm-0-e56c6b86a4a0c81ecaaf8e757d6474a4)